In November 2021, In Ghana, West Africa, we started our village borehole and pump water project, for rural populations, who do not have access to clean water.  Our dedicated team, headed by Bismark Adjei, identified villages in the Volta region of Ghana for the first phase of this project. As well as drilling new boreholes, we are also repairing and maintaining boreholes/pumps which are no 
longer functioning. We are also taking samples of water from the boreholes to check for composition and contamination, for ensuring safety of consumption. 

VIDYA JYOTHI BROKEN BOREHOLES REPAIRS SURVEY (Volta region 19th -20th February 2022)

Name of village Demographics Survey report
AGOVOME
(TOTAL POPULATION OF ABOUT 1000 PEOPLE) WITH THREE BOREHOLES INSTALLED 1997-2000
First Borehole was installed in the year 1997,has a static water level of 37ft,Pump broken and can be replaced to serve water. No NGO details. Second Borehole (1997),static water level is 30ft = 9metres,Pump broken and needs replacement. Third Borehole is a new drilling without pump installed and no platform. Drilling is bad, would suggest they manage the other two when fixed.
DORFOR ADIDOME
(TOTAL POPULATION OF ABOUT 1300 PEOPLE) WITH THREE BOREHOLES INSTALLED 1997-2000
First Borehole blocked with stones, new drilling has to be done. Second Borehole (1997),static water level is 40ft = 12metres,Pump broken and needs replacement. Third Borehole is broken too, pump needs replacement
VOLO
(TOTAL POPULATION OF ABOUT 1700 PEOPLE) WITH FOUR BOREHOLES INSTALLED. YEAR 1997
First Borehole has a water level of 12.1m,and closer to a school. New Pump has to be installed. Second Borehole, static water level is 40ft = 12metres. Pump broken and needs replacement. Third Borehole blocked with stones, new drilling is the solution. Fourth Borehole blocked with stones sands, new drilling is the solution
KPEKPEO
(TOTAL POPULATION OF ABOUT 1000 PEOPLE) WITH ONE BOREHOLE INSTALLED 13YRS AGO
Borehole blocked with stones, new drilling has to be done. New drilling has to be considered please since there’s no source of water at all and also closer to a school
MORKPLIKPO
(TOTAL POPULATION OF ABOUT 1000 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED 1997-2000
Borehole broken and needs a new pump. Pipe needs an extension, only 13 pipes were installed instead of 17 to enable much access to water
KELORKPO
(TOTAL POPULATION OF ABOUT 1300 PEOPLE) WITH TWO BOREHOLES INSTALLED 1997-2000
First Borehole is a new drilling and has a static water level of 9m. Needs a pump installation and platform to function. Second Borehole, Pump broken and needs replacement plus a three bags of cement to renovate defected platform.
TORTOKORPE
(TOTAL POPULATION OF ABOUT 2000 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED
New Drilling but organization never came back to complete. It has been 7yrs now. New Pump and Platform needed to run. Due to the population, would suggest an additional borehole for them
NGORLEKPOE
(TOTAL POPULATION OF ABOUT 1000 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED.1997-2000
Borehole is a solar powered type but not functioning. Can be repaired but has to be a manually pumped type hence. Few parts can be replaced so no new pump needed to be installed.
YAVE
(DRILLED BY A MANUFACTURING COMPANY WHO OPERATES ON THE LAND OF THE VILLAGE)
Borehole drilled but unfinished, Jupiter to confirm why company has not completed the borehole for the community.
TAGADZI
(TOTAL POPULATION OF ABOUT 1000 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED.
Borehole uncompleted, Needs new pump and platform installation. Has a static water level of 13m
ATTITEKPUI
(TOTAL POPULATION OF ABOUT 1500 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED
Borehole drilled 16yrs ago but hasn’t been completed till date. Needs new pump and platform installation.
NOGOKPOE
(TOTAL POPULATION OF ABOUT 1200 PEOPLE WITH TWO BOREHOLES INSTALLED)
Borehole drilled but unfinished, Needs new pump and platform installation. Second Borehole, Pump broken and needs replacement
PODOE
(TOTAL POPULATION OF ABOUT 1500 PEOPLE) WITH ONLY ONE BOREHOLE INSTALLED.
Borehole, Pump broken and needs replacement

Invoice we received from the drilling company. Depicts actual cost of the borehole, platform construction and polytank with motorised pump which we installed in January 2022 for village Tornu.